Beijing Dongzou District, Dongzou District, Beijing 02-03 Residential Construction Project

Project Name: General directional protection and resettlement plan of Dongcheng District, Beijing, Dongzhuang, Beijing and 02-03 residential construction project (March 2012 - December 2016, 100 million)
Region: Beijing Progress: Construction Preparation Period: October 2011 - October 2013 Major equipment: Cranes, fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities. (for reference only)
Project Description:
The project is located at No. 1 , Dougezhuang, Chaoyang District, Beijing. It will construct two 29-storey residential buildings with a two-story basement with a total gross floor area of ​​approximately 62,577 square meters. The total investment of the project is 100 million yuan.
Construction Unit: Residential Development Center, Dongcheng District, Beijing

Postal address: 58 Di’anmen East Street, Beijing Postcode: 100009
Contact: Gao Weiping Tel, 010-64039952

Design Unit: Beijing Zhongjian Mubei International Design Center (Sino-American Joint Venture)
Postal address: Room 6081, Building A, Zhongjian Building, No.15 Sanlihe Road, Haidian District, Beijing Postcode: 100037
Contact: Zhao Hongfeng (architect)
Telephone, 88083638

Design Unit: Beijing Zhongjian Mubei International Design Center (Sino-American Joint Venture)
Postal address: Room 6081, Building A, Zhongjian Building, No.15 Sanlihe Road, Haidian District, Beijing Postcode: 100037
Contact: Wu Guorong (architect)
Telephone, 88083638

Related Developments: Tower Crane Infrastructure Project

Hardened Shaft

Hardened Shaft,Turning Parts Shaft,Cnc Machining Turning,Propeller Shaft

JING SUNG Precision CO., , https://www.zjcncmachining.com