Dongfeng Tianlong series models maintenance and maintenance (4) --- Dongfeng Tianlong equipped loading axle introduction
Dongfeng Dana 460 Drive Bridge Features The introduction of Dana technology, independent innovation. Front axle The front axle has a large bearing capacity of 7000kg. Wheel hub Outsourced front and rear axles: The front and rear axle hub structure of the old structure needs to disassemble the bearing and the oil seal when the brake is maintained, causing damage during assembly. Gabion Mesh,Pvc Stone Basket,Rock Retaining Wall,Gabion Iron Wire Basket anping yaqi wire mesh co.,ltd , https://www.yaqisteelwire.com
High-bearing systems further improve reliability.
The single-stage bridge can increase the transmission efficiency of the entire vehicle and is suitable for high-speed operation.
Compared with the wheel drive axle, the overall vehicle fuel consumption is reduced by an average of 3-5%.
Low price, high torque, strong bearing capacity.
Brake drum outsourcing (easy maintenance)
End box type I-beam type, made of high-strength material forged, the surface after shot peening treatment, with superior carrying capacity.
The front axle is an outsourced design, which greatly facilitates the daily maintenance of the brake and effectively reduces the cost of use.
Outside the brake hub outside the wheel hub;
Easy maintenance, no need to disassemble bearing and oil seal;
Light weight, single bridge weight loss 8kg.
View related topics: Introduction, maintenance and maintenance of Dongfeng Tianlong series models